Short answer. Yes, in most cases. In Seattle you need a sign permit from the Seattle Department of Construction and Inspections (SDCI) for any sign larger than 5 square feet or any sign connected to electrical power. Permits are applied for online through the Seattle Services Portal.
What needs a permit
- A sign permit is required for signs larger than 5 square feet or connected to an electrical power source, including outline and border tube lighting.
- A permit is also needed to install, alter or retrofit sign lighting, including LED retrofits.
- A permit is needed when a sign is erected, re-erected, constructed, painted, posted, applied, altered, structurally revised or repaired, unless the Seattle Building Code exempts it.
- An awning permit is needed to install or alter an awning, to re-cover it with new fabric, or to add signage or change the business name on it.
- Signs that extend over a public right-of-way also need a separate street use permit from the Seattle Department of Transportation (SDOT), obtained first.
- A final inspection must be passed before the permit expires. If it expires first, you may need to reestablish it and pay an added fee, or get a new permit under current rules.
Key rules
- Sign types, sizes and quantities depend on the zone, so a sign allowed in one zone may be prohibited in another (SMC Chapter 23.55).
- New billboards (off-premises signs) are not allowed except at existing registration numbers, and billboard registrations must be renewed every year.
- Signs in a historic or special review district, or on the same lot as a landmark, need a certificate of approval from the Department of Neighborhoods.
- Signs in a Shoreline District must also meet the shoreline sign standards.
- Electric signs must meet the Seattle Electrical Code, the Seattle Energy Code and the illumination restrictions of the sign code.
- Cannabis and alcohol businesses must also follow Washington State Liquor and Cannabis Board sign rules.
How to apply
- Apply in the Seattle Services Portal: under Create New choose Permits, Trade, Construction and Land Use, then Sign, Awning, and Canopy Permit. You need a portal account.
- Submit PDF plans: a site plan showing street frontage and property lines, an elevation of the building or structure, construction drawings with copy, sign area in square feet, dimensions and projection, and installation and attachment details.
- Include the sign owner, the building or property owner, and the installer's Washington contractor license number and expiry date (unless the owner installs).
- Fees: a basic fee covers signs up to 32 square feet, plus an added amount for each additional 10 square feet. Awning and outline lighting fees are based on project value. Electrical fees are added for lit signs. See the SDCI Fee Subtitle.
- Complete applications are usually reviewed and issued in about one week (about 5 business days).
- Ground and pole signs need a footing inspection at least 24 hours before concrete is placed. Request inspections at (206) 684-8900. Request the final inspection within 24 hours of energizing an electric sign.
- Contact SDCI, 700 5th Ave, Suite 2000, Seattle, (206) 684-8600.
Lit signs and electrical permits
The City of Seattle sign permit covers size, placement and appearance. Electrical work for a lit sign is a separate permit. The City of Seattle issues electrical permits and inspections, not L&I. For a lit sign the electrical permit is included in the SDCI sign permit when you fill in the illumination information, and the sign must be installed by a licensed electrical contractor unless the owner installs it.
Sources
This page summarizes official City of Seattle sources. Codes and fees change, so confirm with the city before you order or install a sign.
